The concern was started in the year 2007 as a partnership entity in the name of Shree Hari Projects to undertake and execute projects on contractual basis related to water supply, storage, drainage/treatment of effluent etc. in Private and Public Sector. Owing to growing business needs it was converted into Private Limited Company in 2009 as Shree Hari Infra Projects Pvt Ltd (SHIPPL).

contact info

social networks

image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image

Sanchore (ER) Water Supply Project

Execution of Earth Work, Single PCC Block Lining, Pucca structures, Diggies, Pump Rooms, Sump wells Boundary Wall & Supplying, Laying, Jointing & Commissioning of Distribution net work of High Density Poly ethylene (HDPE) pipes with electrically operated motor with desired accessories on system of Arwa, Ogala & Dudhwasan Minors of Panoriya Lift Distributary off-taking from 5.375 Km of Bhimguda Distributory of NMC including designing and layout of mechanical work on turnkey basis.

CLIENT  -  Public Health Engineering Department, Rajasthan

PROJECT COST  -  Rs. 368.29 Crores


SCOPE OF WORK

Execution of works related to "Transmission Main for Water Supply Project of 256 Villages and Bhinmal Town of District Jalore-Narmada ER Project" viz.Construction of RWR, Water Treatment Plant, 33/6.6 KV Switchyard, P,L&J of Raw and clear water transmission main and related works between RD 29.30 of Narmada Main Canal and Ramseen; and related Civil, Mechanical, Electrical & Instrumentation works at various pumping stations, complete job as per scope & specifications on Single Point Responsibility Basis Turnkey Job contract including necessary Design and operation and maintenance for 10 years followed by 1 year of defect liability period. 

The scope of work under this Single point Responsibility Contract includes construction of all works related to taking Raw Water from outlet provided on Narmada main canal at RD 29.30( Near Village Dedwa ) its Raw water transmission main from RD 29.30 to Palri Solankiya (MPS), RWR, WTP, Pumping Stations, Clear Water conveyance up to rates, BPS-1 (Digaon), Bhinmal (BPS-2), Agrawa (CWR) & Ramseen (CWR) the tail end points of the two CW trunk mains ER and EL respectively including intermediate boosting and off takes. This also includes execution of V.T. type Raw water pump houses at RD 29.30 (near Dedwa village) & Palri Solankiya (MPS) and HSC type clear water pump houses at BPS-1 (Digaon), BPS-2 (Bhinmal), CWR(Agrawa) & CWR (Ramseen), Construction of CWRs at Palri Solankiya, EMI works at RW pump house at RD 29.30 (Dedwa khurd), Palri Solankiyan & CW pump houses at BPS-1 (Digaon), Bhinmal (BPS-2), CWR (Agrawa) & CWR (Ramseen), Instrumentation with PLC at all installations with provision for future inter facing with  project “SCADA” system for DATA transfer at WTP, communication through WLL / GPRS mobile system and all other related civil works as described in subsequent paras  including operation & maintenance of the system so created for clear water supply to different Various or more as required off take points at required head with varying RWR levels, co-efficient of friction etc. during its operation, and other works listed herein or any other works necessary to achieve the objective to deliver the required quantity of water in energy efficient, safe, effective and reliable manner and complete the system as per the best acceptable engineering practices.