The concern was started in the year 2007 as a partnership entity in the name of Shree Hari Projects to undertake and execute projects on contractual basis related to water supply, storage, drainage/treatment of effluent etc. in Private and Public Sector. Owing to growing business needs it was converted into Private Limited Company in 2009 as Shree Hari Infra Projects Pvt Ltd (SHIPPL).

contact info

social networks

image
image
image
image
image
image
image
image
image
image

Nagaur lift project

Work for construction of cluster distribution net work, IEC activities, pump houses, clear water reservoirs, over head service reservoirs, 33 KV Switchyards village distribution net work under package-III of Nagaur Lift Project, Phase-I with Operation & Maintenance of complete System for 10 Years on Single Point Responsibility Turnkey Basis .

CLIENT - Public Health Engineering Department, Rajasthan

PROJECT COST -  324.91 Cr.

Villages and towns Covered – 151 & 2 Nos.


SCOPE OF WORK

The scope of work under this Single point Responsibility Contract includes construction of Pumping stations at Moondawa, Sankhwas, Kuchera, Ren, Gaguda Fanta, Merta Road & Gotan with 33 KV switchyard, construction of clear water reservoirs, elevated service reservoirs, distribution net work from ESR to village transfer chamber, village distribution net work, construction of public stand post’s, cattle water trough’s & IEC activities in the 151 villages & 2 towns namely Moondawa & Kuchera of Nagaur District. The contractor has to be also undertaken operation and maintenance of system for 10 years after completion of works.

1. Construction of CWR. 8 Nos CWR at Moondawa, Kuchera, Ren, Merta City, Sankhwas, Gaguda Fanta, Merta Road & Gotan as per proposed capacity. Public Health Engineering Department NAGAUR LIFT PROJECT PHASE-I (PACKAGE-III) Tender Document Volume II-Scope of work ACE(P),PHED,Ajmer

2. RCC framed structure Pumping Stations. 7 Nos. at Moondawa, Kuchera, Ren, Sankhwas, Gaguda Fanta, Merta Road & Gotan Head Works.

3. 33 KV Switchyards. 7 Nos. at Moondawa, Ren, Sankhwas, Gaguda Fanta, Merta Road & Gotan having 33/0.415 and at Kuchera 33/6.6/0.415KV.

4. Construction of ESR’s 55 Nos ESR’s.

5. Supply, laying & jointing of mS/DI Pipe lines. Transmission mains from pumping station to CWR’s and Rising main from pumping station to ESR’s.

6. Distribution net work by supply, laying & jointing of uPVC pipes. For 151 villages.

7. Construction of PSP & CWT’s Total CWT’s & PSP’s are 743 and 1189 respectively.

8. Construction of village transfer chamber. 151 Nos.

9. IEC activities. For 151 villages.

10. Constriction of boundary wall Boundary wall for ESR’s and Head Works.

11. Electro-mechanical works. As per scope of the contract.

12. Instrumentation work. As per scope of the contract.

13. Operation & maintenance. 10 years for entire system

Salient Features of the project:

36 Km of MS pipeline.

79 Kms of DI K-9 Pipeline

449 Kms of DI K-7 Pipeline

726 Kms of uPVC Pipeline

929 RCC Public Service Posts

581 RCC Cattle Water Trough

151 Village Transmission Chambers with GSM based water meters.