The concern was started in the year 2007 as a partnership entity in the name of Shree Hari Projects to undertake and execute projects on contractual basis related to water supply, storage, drainage/treatment of effluent etc. in Private and Public Sector. Owing to growing business needs it was converted into Private Limited Company in 2009 as Shree Hari Infra Projects Pvt Ltd (SHIPPL).

contact info

social networks

image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image

State Water And Sanitation Mission Lucknow, Haraulipur

Construction of Haraulipur Group of Villages Water Supply Scheme (Surface Water) and Electric/Solar based Piped Ground Water Supply Schemes (125 Nos) In villages of blocks(Gohand, Muskra, Sarila and Rath), District-Hamirpur with relevant works including Commissioning and Operation & Maintenance for 10 Years.

CLIENT  -  NAMAMI ANGE AND RURAL WATER SUPPLY DEPARTMENT UTTAR PRADESH

PROJECT COST -  Rs. 323.66 Crore

PROJECT BACKGROUND/SCOPE OF WORK  

(1)Objective – The objective of the U. P Government is to provide drinking water through pipe system to every household under the project area. The Contractor is to ensure compliance of this objective while executing the project and to ensure O&M for 10 years. 
(2)Summary of Works  
(2.1)For Tube-well Projects – Tube-well, Rising Main, Over Head Tank, Distribution System & Appurtenant Works including all E&M works and O&M. 
(2.2)For Surface Water based Projects – Intake, Rising Main, Water Treatment, Feeder Main, Sumps, Pumping Stations, Over Head Tank, Distribution System & Appurtenant Works including all E&M works and O&M. 
(3)Item Rates - For any extra items whose rates are not mentioned in BOQ, shall be paid as per Common Schedule of Rates during 2019-20 or with respect to bidding cost whichever is lower. For that item mentioned in the BOQ shall be paid as per rate quoted by Contractor in price bid. 
(4)Structural Design Considerations – The structural design shall be with considerations of windload, seismic effects and soil considerations of site. 

Major Works to be Executed

S. No.

Works

 Quantity

 

1

Intake Well (11 MLD)

01 No.

2

WTP (09 MLD)

01 No.

3

MCWR/CWR (100 Kl - 800 Kl) With Chlorination Room

08 Nos.

4

OHTS (7 Kl- 450 Kl)

139 Nos.

5

Rising/Gravity Mains/Distribution Mains Providing, Laying, Jointing And Commissioning.

(I)

 DI K-7 & DI K-9

109.5 Km

(II)

 HDPE

1120.68 Km

6

Single Room Staff Quarter

113 Nos.

7

Raw/Clear Water Pumps (VT/HSC)

40 Nos.

8

Electromechanical Type Chlorination Plant With 0 - 6 LPH Capacity Pump Set

140 Nos.

9

Construction of  Electric Power Sub-Station Room (10 KVA-200 KVA)

08 Nos.

10

Tube wells (5 LPM-700 LPM)

127 Nos.

11

Clear Water Reservoir & Pump House Cum Chlorination Room (CWR 125 Kl)

01 No.

12

Submersible Clear Water Pump Set (1.00 H.P-25.0 H.P.)

127 Nos.