The concern was started in the year 2007 as a partnership entity in the name of Shree Hari Projects to undertake and execute projects on contractual basis related to water supply, storage, drainage/treatment of effluent etc. in Private and Public Sector. Owing to growing business needs it was converted into Private Limited Company in 2009 as Shree Hari Infra Projects Pvt Ltd (SHIPPL).

contact info

social networks

image
image
image
image
image
image
image
image
image
image
image
image
image
image

BIRGAON MUNICIPAL CARPORATION WATER SUPPLY PROJECT CHHATTISGARH

Design, Supply, Erection, Commissioning, Testing and trial run for 3 months complete for Augmentation Water Supply Scheme for Birgaon town including 9 months of Operation and Maintenance of exiting and proposed components of the project on TURNKEY Basis.

CLIENT - Birgaon Municipal Corporation (CHHATTISGARH)

PROJECT COST -  115.20 Cr. 
Name of Project Augmentation to BIRGAON Water Supply Scheme.

A comprehensive development plan for BIRGAON town is under preparation, based on the guidelines of MoUD, under which Municipal Corporation BIRGAON, intends to take up Augmentation Water Supply Scheme project for their enhanced need of water supply with appropriate distribution network with the main objective of Universal Coverage through metered connections so that from commissioning of scheme itself the project becomes self supporting.

The main components of works

S. No.

Works

Quantity

1

RCC approach bridge of 130 M long at existing intake well.

1 No.

2

Raw water pumping from intake well to water treatment plant.

4 Km

3

Raw and clear water electric substation at intake well and water treatment plant.

1 No.

4

Raw water pumping main from intake well to water treatment plant.

               800 mm DI K-9

              600 mm DI K-9

130 M

4000 M

5

Construction of water treatment plant (17 MLD).

1 No.

6

Clear water pumping machinery at proposed WTP.

6 Sets

7

Clear water pumping main from CW Sump to OHT DI K-9 Pipeline

24 Km

8

Distribution Network DI K-7 Pipeline

239 Km

 

Sr.No

Particulars

E-1

RCC APPROACH BRIDGE 130 M LENGTH AT EXISTING INTAKE WELL

E-2

RAW WATER PUMPING MACHINERY INTAKE WELL TO WTP

160 BHP Triplicate set of V.T. pumps with 50% Standby to Discharge 702740.47 LPH Each against

total head of 40 M

E-3

RAW AND CLEAR WATER ELECTRIC SUBSTATION

Construction of Electric Sub Station at WTP Site

2 X 750 KVA Outdoor Substations with all allied electrical & civil works

Construction of Electric Sub Station at Intake Well Site

2 X 315 KVA Outdoor Substationswith all allied electrical & civil works

E-4

RAW WATER PUMPING MAIN

800mm DI K-9 Length 130M, 600mm DI K-9 Length 4000M Along Existing 450MM DI K-9 Pipes

E-5

WATER TREATMENT PLANT 17 MLD CAPACITYConventional with Lamella type Clarifiers

i)  Repairs to existing 14 MLD WTP as per the actual site conditions and providing laying, jointing, testing and commissioning 400mm Dia RCC NP2 pipes for drainage arrangement

ii)  Automation to Existing 14 MLD and Proposed WTP of 17 MLD

iii)  Recirculation of wastewater and sludge to make zero liquid discharge.

E-6

CLEAR WATER PUMPING MACHINERY AT PROPOSED WTP

80 BHP (2w+1s) set of Centrifugal pumps with

to Discharge 185725 LPH Each against total head of 57 M

E-7

CLEAR WATER PUMPING MAIN FROM SUMP TO OHT

500 mm to 100 mm dia DI K-9 pipe L=23663 m

E-8

RCC OVERHEAD TANKS 9 NOS PROPOSED OF VARIOUS CAPACITIES

E-9

DISTRIBUTION NETWORK

500 mm to 100 mm DI K-7, Length 238998 m

E-10

ALLIED CIVIL WORKS

Compound Wall to OHT & WTP, Computers & peripherals, Plantation Including tree guard, Nos. 3 Quarters, RCC Roads.

E-11

BULK FLOW METER AT EACH ZONE INLET JUNCTION

800mm to 100mm 55 Nos. for all OHT's and DMA's

E-12

PLC & SCADA OF ENTIRE SYSTEM OF EXISTING AND PROPOSED

Intake, RWPS, CWPS, OHSR's

E-13

REFORM WORKS (GIS Mapping ang Consumer survey)

E-14

CONSUMER METERS

Provision for consumer meters including connection charges to 19600 no of Consumer meters with

household connections & 8000 existing connections fixed with meters and valves.

E-15

Provision for National highway crossing by push through method at Location with length800mm90m & 300mm150m.

 

Operation & Maintenance of Entire existing & proposed scheme for a period of 9Months(Nine

Months) Up to OHTs but excluding Distribution network