Sr.No
|
Particulars
|
E-1
|
RCC APPROACH BRIDGE
130 M LENGTH AT EXISTING INTAKE WELL
|
E-2
|
RAW WATER PUMPING MACHINERY INTAKE WELL TO WTP
|
160 BHP Triplicate set
of V.T. pumps with 50% Standby to Discharge 702740.47 LPH Each against
|
total head of 40 M
|
E-3
|
RAW AND CLEAR WATER
ELECTRIC SUBSTATION
|
Construction of
Electric Sub Station at WTP Site
|
2 X 750 KVA Outdoor
Substations with all allied electrical & civil works
|
Construction of
Electric Sub Station at Intake Well Site
|
2 X 315 KVA Outdoor
Substationswith all allied electrical & civil works
|
E-4
|
RAW WATER PUMPING MAIN
|
800mm DI K-9 Length
130M, 600mm DI K-9 Length 4000M Along Existing 450MM DI K-9 Pipes
|
E-5
|
WATER TREATMENT PLANT
17 MLD CAPACITYConventional with
Lamella type Clarifiers
|
i) Repairs to existing 14
MLD WTP as per the actual site conditions and providing laying, jointing,
testing and commissioning 400mm Dia RCC NP2 pipes for drainage arrangement
|
ii) Automation to Existing 14 MLD and Proposed WTP of 17 MLD
|
iii) Recirculation of wastewater and sludge to make zero liquid
discharge.
|
E-6
|
CLEAR WATER PUMPING
MACHINERY AT PROPOSED WTP
|
80 BHP (2w+1s) set of
Centrifugal pumps with
|
to Discharge 185725
LPH Each against total head of 57 M
|
E-7
|
CLEAR WATER PUMPING
MAIN FROM SUMP TO OHT
|
500 mm to 100 mm dia
DI K-9 pipe L=23663 m
|
E-8
|
RCC OVERHEAD TANKS 9
NOS PROPOSED OF VARIOUS CAPACITIES
|
E-9
|
DISTRIBUTION NETWORK
|
500 mm to 100 mm DI
K-7, Length 238998 m
|
E-10
|
ALLIED CIVIL WORKS
|
Compound Wall to OHT
& WTP, Computers & peripherals, Plantation Including tree guard, Nos.
3 Quarters, RCC Roads.
|
E-11
|
BULK FLOW METER AT
EACH ZONE INLET JUNCTION
|
800mm to 100mm 55 Nos.
for all OHT's and DMA's
|
E-12
|
PLC & SCADA OF
ENTIRE SYSTEM OF EXISTING AND PROPOSED
|
Intake, RWPS, CWPS,
OHSR's
|
E-13
|
REFORM WORKS (GIS
Mapping ang Consumer survey)
|
E-14
|
CONSUMER METERS
|
Provision for consumer
meters including connection charges to 19600 no of Consumer meters with
|
household connections
& 8000 existing connections fixed with meters and valves.
|
E-15
|
Provision for National
highway crossing by push through method at Location with length800mm90m &
300mm150m.
|
|
Operation &
Maintenance of Entire existing & proposed scheme for a period of
9Months(Nine
|
Months) Up to OHTs but
excluding Distribution network
|