The concern was started in the year 2007 as a partnership entity in the name of Shree Hari Projects to undertake and execute projects on contractual basis related to water supply, storage, drainage/treatment of effluent etc. in Private and Public Sector. Owing to growing business needs it was converted into Private Limited Company in 2009 as Shree Hari Infra Projects Pvt Ltd (SHIPPL).

contact info

social networks

image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image

BARMER LIFT WATER SUPPLY PROJECT PHASE IV

Drinking Water Supply Project in Barmer District on Single Responsibility Turn  Key Lump Sum Based Contract, which includes providing, laying, jointing, testing and commissioning of Transmission and Cluster Distribution mains, RCC ground level/ elevated reservoirs, pumping arrangements, Monitoring and Control of flow with Meters, FCVs, PLC & SCADA, and allied activities on the risk & cost.

Client - Public Health Engineering Department, Rajasthan

Project Cost – 112.53 Cr.

villages covered – 171 Nos. 

POPULATION COVERAGE AND DAILY DEMAND OF WATER 
Total 171 villages of Barmer district to be benefited from this project. With the population projection factors @ 1.313, 1.977 and 2.975 over the census data of 2001, the population has been assessed for the ear 2011, 2026 and 2041 respectively. The daily water demand is assessed taking per capita water requirement @55 per day and 15% factor added towards un-accounted for water.
Major Works to be Executed

S. NO

ITEM DESCRIPTION

Quantity

1

 DI Pipeline K-7 & K-9 (80 mm to 450 mm dia.)

(I)

 DI Pipeline Supply

13 Km

(II)

 DI Pipeline Laying & Jointing

16 Km

(III)

 DI Pipeline Testing

117 Km

(IV)

 DI Pipeline Commissioning

360 Km

2

 uPVC Pipeline (90 mm to 315 mm)

411 Km

3

 Pump House

5 Nos.

4

 CWR

5 Nos.

5

 MBR

2 Nos.

6

 Staff Quarter

22 Nos.

7

 OHSR’s

59 Nos.

8

 Boundary Wall

17 Km

9

 Village Transfer Chamber

171 Nos.

10

 Approach Road

19 Km