NAWA PROJECT
Work of Regional Water supply scheme of 72 villages & 24 NRVs along with dhanies, Tehsil Nawa, District Nagaur on Transmission Main-I under Bisalpur Dudu Water Supply project on single responsibility Basis, i.e. Design ,Build, Operation & Maintenance for 10 years
CLIENT - PUBLIC HEALTH ENGINEERING DEPARTMENT (RAJASTHAN)
PROJECT COST - RS 101.00 cr
The administrative and financial sanction for Water supply project of 72 villages and their dhanies of Tehsil Nawa District Nagaur, was accorded on-file on 2.5.2012 for Rs. 125 crores (Including contingency and prorata).Out of 1522 villages proposed to be covered under the Bisalpur Dudu Project, 804 (as per 2001 census) villages are to be covered under phase I Part II of the project. Out of the 804 villages, 72 villages & 24 NRVs along with dhanies shall be fed from Govindi, Simbhupura and Nawa Pumping station. The demand of these 72 villages has been taken on Transmission Main system I in Part I of the project. The work of Transmission Main System I has been completed from Surajpura to Sambhar under a separate contract under Single Responsibility basis.
The villages under this work will be benefitted from three pump houses namely as below:
S.
No.
|
Name
of PS
|
No. of villages
|
1.
|
Govindi
Pumping Station
|
34
|
2.
|
Simbhupura
Pumping Station
|
29
|
3.
|
Nawa
Pumping Station
|
33
|
|
Total
|
96
|
The scope of work under this Single Responsibility Contract includes construction of all works with related supply of material, for the regional water supply schemes for 72 villages & 24 NRV and their dhanies originating from Govindi, Simbhupura and Nawa Pumping Station and as described in subsequent paragraphs.
- Handling of Local villagers and administration.
- During any breakdown we have to work 24 hours in any season and to restore supply any how. None of compromising from department and local administration.
- Maintain good water quality till tail-end by disinfection technics.
- Our services are consider as emergency services and working hours are 24x7.
- To maintain proper pressure at public Stand Post (PSP) & controlling illegal connection.
- Patrolling of wide network of pipeline, Handling of Local villagers and administration.
- During any breakdown we have to work 24 hours in any season and to restore supply any how. None of compromising from department and local administration.
- Maintain good water quality till tail-end by disinfection technics.
- Our services are consider as emergency services and working hours are 24x7.
- To maintain proper pressure at public Stand Post (p) & controlling illegal connection.
- Patrolling of wide network of pipeline.